Below is a selection of sites where Hydroworks has installed new or upgraded turbines:
|
|
The Deep Stream hydroelectric scheme is located in Otago, it consists of two stations each with a single Francis turbine with nominal outputs of 3,100 and 2,850 kW. Hydroworks designed and commissioned the turbines, relief valves, actuator oil system and station services for each station. The stations are located in series and connected by canals and GRP penstocks. Download the Deep Stream Project Sheet for more information.  | Deep Stream 1: Installation |
|
|
|
Hydroworks was commissioned by TrustPower Ltd to redesign the two 3000kW 1922 Escher Wyss Francis turbines at Coleridge power station to improve their efficiency and service life. The first unit, G8, was recommissioned early 2008 with a new runner, modified guide vanes and new seal rings and cheek plates. The second turbine, G9, is currently undergoing a more complete rebuild including new guide vanes and regulation linkages. The first unit was found to have had an increase in efficiency of 12% after refurbishment. Download the Coleridge G8/G9 Upgrade Project Sheet for more information.  |
| G9 Prior to upgrade. | G8 After upgrade. |
|
|
|
|
|
|
|